BrightNTech

Industrial sectors

One method, five industrial sectors.

The questions below are the kind a Decision Sprint answers: one business question, the data it requires, and what the Decision pack establishes. Each case is an illustrative example, not a client reference.

Manufacturing

Illustrative example
Typical question
What is the real cause of yield differences between our production lines?
Data
MES, historians, quality, maintenance.
Decision pack
Root-cause diagnosis, prioritisation, measurement gaps.

Chemicals

Illustrative example
Typical question
Are our process drifts driven by raw materials or by operating conditions?
Data
Batch records, LIMS, sensors, suppliers.
Decision pack
Traced diagnosis, batch compliance and traceability.

Electronics

Illustrative example
Typical question
Where do our defects concentrate, and are they attributable to design, components or assembly?
Data
In-line tests, field returns, procurement.
Decision pack
Defect map, tested hypotheses, actions.

Automotive

Illustrative example
Typical question
What is the real impact of a supplier change on quality and warranty costs?
Data
Warranty, supplier quality, production.
Decision pack
Cost/quality diagnosis, conditions of validity.

Aerospace

Illustrative example
Typical question
Do our maintenance data justify a change of maintenance interval?
Data
Maintenance, airworthiness, operating history.
Decision pack
Diagnosis with traceability suited to regulatory requirements.

Another sector, same method

Brief, hypotheses, data qualification, testing, validation, Decision pack. The method does not change with the sector; the data sources and the regulatory traceability do.

Read about the capability
Decision Sprint

Your question, your data, a traced diagnosis in 3 to 4 weeks.

Start with a Decision Sprint: fixed scope, fixed duration, one Decision pack.